Aspect
Boilers (gas)
Electrical System
Emergency Lighting
Fire Alarm
Fire Extinguisher
Fire Doors
Lightning Protection
Lifts
PAT Testing
Pressure Systems
Emergency Communication System
Water Hygiene
Expansion Vassels
Requirements
Regular servicing, 'Gas Safe' Inspection, Provision of Gas Safety Certificate
Fixed electrical installation inspect and testing
Testing replacement of bulbs and batteries
Regular maintenance, testing of call points and sounders, testing of detectors
Servicing and inspection
Maintenance and inspection
Inspection
Servicing, Insurance Inspection
Visual inspection. Formal PAT test
Maintenance and inspection
Testing
Disinfection. Flushing, Microbiological Testing Review
Maintenance/Testing
Frequency
Annually
5 yearly or 20% per year
Monthly flick test, six monthly 1 hour test, yearly discharge test - 3 hours
Weekly alarm test, yearly test of detectors
Annual
Annual
Annual
6 months
Annual - three yearly depending on risk
Generally annually
Monthly
Weekly flushing low use outlets Monthly temperature checks Quarterly microbiological sampling Disinfection when required
As per L8 recommendations
Applicable Law
Gas Safe
NECEIC Regulations Electricity at Work Regulations 1989
Regulatory Reform (Fire Safety) Order 2005
Regulatory Reform (Fire Safety) Order 2005
Regulatory Reform (Fire Safety) Order 2005
Regulatory Reform (Fire Safety) Order 2005
Electricity at Work Regulations 1989
Lifting Operations and Lifting Equipment Regulations 1998
Electricity at Work Regulations 1989
Pressure Systems Safety Regulations 2000
Regulatory Reform (Fire Safety) Order 2005
Control of Substances Hazardous to Health Regulations 2002
L8 ACOP
COSHH 20002/L8